A warehouse roof turned into the site's largest asset

A 420 kWp array across 3 000 m² of steel roof, with no battery at all, built for the fastest possible payback on a two-shift operation.
Concept project, not a real installationLogistics warehouse, port zone in Vridi, Abidjan, studied in 2025

Roof plan

20 m
Illustrative layout: 764 panels of 550 W on a 80 × 40 m roof, with walkways for cleaning.

The system

Solar array
420 kWp
Battery
None
Panels
764
Production
546 MWh / yr
Load from solar
31 %
CO₂ avoided
240 t / yr

Location: Abidjan, where a kilowatt of panels produces about 1 300 kWh a year.

The challenge

Cold rooms, forklifts charging and lighting for two shifts made electricity the warehouse's second-largest cost after labour. The operator wanted savings, not backup the site already has a grid connection it trusts.

The design

With no storage to pay for, the design question was only how much array the daytime load could absorb. We stopped at the point where more panels would mostly feed energy back to nobody, and routed forklift charging to the midday hours.

A modelled average day

00:0006:0012:0018:0000:00
  • Solar, used directly1 496 kWh
  • From the battery0 kWh
  • Still from the grid3 088 kWh
  • Site demand4 584 kWh

Reconstructed from the study's production and solar share with a typical workshop or factory load profile.

Modelled results

Of the annual load met by solar
31 %
Self-consumption of solar output
96 %
Estimated payback
3–4 years